Battery Energy Storage System (BESS) Tracker

Track U.S. battery energy storage systems with project-level size, duration, contract capacity, point-of- interconnection, timelines, relationship to data centers, and more.

Intro to Halcyon’s BESS Tracker

Halcyon's BESS Tracker compiles information on newly proposed, in development, and under construction battery energy storage systems across the United States. The dataset consolidates key project details into a structured, research-ready dataset, drawing from state public utility commission (PUC/PSC), regional grid operator (ISO/RTO), and  Federal Energy Regulatory Commission dockets, as well as U.S. Energy Information Administration (EIA) datasets.

Each project entry captures essential attributes such as docket numbers, project names, capacity, size, duration, technology type, development milestones, planned operating year, point-of-interconnection, and developers. Where available, the dataset includes granular details such as parent company, contracted capacity, relationship to data centers, battery manufacturer, cost figures, behind-the-meter, co-location specifics, and inverter make and model.

Human-in-the-loop

Halcyon's analysts use AI-assisted search to identify relevant filings, and each data point is validated by subject-matter experts. The result is a uniquely reliable resource for understanding the scale, timing, and characteristics of upcoming battery storage across the U.S. electricity landscape.

Halcyon updates the Grid to incorporate new projects weekly and updates already tracked projects on a monthly basis as information becomes available.

More information you would like to know across all projects?

Subscribers can add new columns to tease out details for their bespoke purpose. Choose from one or two words, a short phrase, a few sentences, dates, years, whole number, decimal number, or true/false to fetch the information in the format of your choosing.

The more verbose your question, the better. As our head of engineering likes to remind us, robots do best when instructed explicitly, “do what I say, not what I mean.”

Methodology

Field
Column Type
Description
Project Name
Text
Name of the battery energy storage system project
State
Text
State where the project is located
County
Text
County/Parish where the project is located
BA Code
Text
Relevant balancing authority
Utility
Text
The utility providing transmission and distribution for the BESS
Docket Number
Text
Proceeding numbers for the applicable state Commission, ISO/RTO, or FERC Typically an interconnection agreement, exempt wholesale generator, certificate of public convenience, or power company registration proceeding Citations include a link to Halcyon AI generated Docket Profile Page.
Technology
Text
Battery technology type
Capacity (MW)
Decimal number
The maximum electric output an electricity generator can produce under specific conditions
Size (MWh)
Decimal number
Total potential power a storage system can contain
Duration
Decimal number
Number of hours of continuous discharge of power
Counterparties
Text
The names of the counterparties with anticipated or signed agreements for dedicated offtake from the project.
Contracted (MW)
Decimal number
The contracted or guaranteed peak power capacity of the project in megawatts (MW)
Contracted (MWh)
Decimal number
The contracted or guaranteed energy capacity of the project in megawatt-hours (MWh)
Contracted Capacity Details
Text
Description of the contracted capacity arrangement, such as the agreement type, key performance obligations, and any penalty or liquidated damages provisions for capacity shortfalls
Data Center Details
Text
Description of the project's relation to a data center, hyperscale facility, cloud campus, server farm, data processing facility, or similar, if applicable.
Announcement Date
Date
Earliest date with information on the project in Commission proceedings
Construction Start Date
Date
Expected or actual date for construction to begin
Commercial Operation Date
Date
Expected or actual date of commercial operation (COD)
Queue Number
Text
Unique identifier assigned to project by regional grid operator (ISO/RTO)
Project Status
Text
The project's current state at a high level: announced, in development, in construction, constructed, operating, or canceled
Study and Permit Status
Text
A more detailed status for the project, such as permitting, feasibility study, interconnection requested, interconnection agreement executed, energization, etc.
Status Description
Text
A long-form description of the project’s development status, including key milestones such as permitting progress, offtake agreement execution dates, and construction timing.
LGIA
True/False
True if the project has a Large Generator Interconnection Agreement for the project Click the citation to get to the latest LGIA
SGIA
True/False
True if the project has a Standard Generator Interconnection Agreement for the project Click the citation to get to the latest LGIA
EWG
True/False
True if the project has a Exempt Wholesale Generator filing for the project Click the citation to get to the latest LGIA
CPCN
True/False
True if the project has a Certificate of Public Convenience and Necessity for the project Click the citation to get to the latest LGIA
ESA
True/False
True if the project has a Energy Storage Agreement for the project These may be energy storage agreements, tolling agreements, power purchase agreements, or other agreements for offtake of storage capacity Click the citation to get to the latest LGIA
Inverter Size (kW)
Decimal number
Cumulative inverter size or power rating in kilowatts
Inverter Details
Text
Details such as the inverter configuration, make and model, number of units, and per unit rating
Inverter Make
Text
The supplier / manufacturer of the inverter
Inverter Model
Text
Specific model of the inverter
# Units
Whole number
Number of units of the inverter for the project
Battery Manufacturer
Text
The company that produces the battery cells / modules used in the project
Co-Located Generation
True/False
True if the BESS is co-located, paired, or hybridized with another generation facility (e.g., solar, wind, natural gas). False otherwise.
Co-Located Generation Details
Text
If co-located, details such as the name of the paired generation project, its capacity, the shared interconnection. Blank otherwise.
Behind-the-Meter
True/False
True if the energy storage is or will be installed on the customer's side of the utility meter. False otherwise.
Point of Interconnection
Text
The substation, bus, or transmission node where the BESS connects to the electric grid
Substation
Text
Name of the POI substation or switching station
Voltage
Kilovolts of the POI substation or switching station
Location Details
Text
Street address, city, or other description of the project location
Coordinates
Text
Latitude and longitude Exact coordinates or approximate at a street address level Projects with only an approximate location known (e.g., city, county) are blank
Parent Company
Text
The highest level company involved in developing or owning the project
Developers
Text
The companies responsible for developing, owning, or leading the construction of the project through its phases
CapEx ($M)
Decimal number
Anticipated upfront cost to build the project
Cost ($/kWh)
Decimal number
Capital cost per kilowatt hour of storage capacity
Cost ($/kW)
Decimal number
Capital cost per kilowatt of installed capacity
Cost Details
Text
Details around costs, such as regarding construction, battery stack, cost overruns, and more

Data Handling

To standardize information for convenient interpretation in the dataset, Halcyon converts some information into normalized formats. This is only done for clarity, never to “fudge” information. Halcyon’s #1 goal is to faithfully represent information presented in the regulatory record.

Type / Field
Description
Dates
Construction and commercial operation date are often disclosed as quarterly periods (e.g., “Q3 2026”). Halcyon converts these to dates based on the last day of the period (e.g., “Q3 2026” → “September 30, 2026”)
Coordinates
Halcyon provides latitude and longitude coordinates only when they are disclosed precisely. If the degrees-minutes-seconds (or decimal version) are disclosed in the regulatory record, we capture them. If the street address is provided, we approximate coordinates based on that address. But if the project’s location is only known to a city, county, or other high-level, then the Coordinates field is left blank.
Verified but not Cited
As of September 2026, Halcyon does not yet support citations to authoritative tabular sources such as the EIA 860, ERCOT interconnection queue xlsx, etc. Halcyon’s BESS Tracker includes information from those sources, such as developers, commercial operation dates, and more. These cells have no-citations but are verified with the source.
 